Issue triage and corrective action

Safety / quality observations

Premium construction safety operations for board-level visibility: site risk, field evidence, corrective actions, and audit readiness.

Open
2
Critical
0
High
1
Resolved
0

Open observations

action required
Missing edge protection at Level 3 west slab
Riyadh Metro Package A · Level 3 · west slab

Open edge was found without complete barricade. Immediate control and corrective action required.

highopen
Rebar cover check pending before pour
Riyadh Metro Package A · Zone B · grid C4

QA/QC needs cover block confirmation before next pour release.

mediumopen