Installable MVP · Construction Operations
Site command center
Practical field workflow for daily reports, safety/quality observations, site risk, and audit exports. Tenant: Construction Operations · KSA · Asia/Riyadh
Sites
1
Active
1
Daily reports
1
Open issues
2
Image evidence
1
Avg progress
42%
Today’s operating risk
Review open observations and assign owners/due dates.
Selected site
Riyadh Metro Package A
RMP-A · Riyadh
Manager: HSE Manager
Status: active
Latest daily report
2026-07-02 · day
42% progress · 126 workers · 18 equipment
Concrete pour completed for Zone B; MEP rough-in started on Level 2.
Blocked: Permit coordination and material delivery window need follow-up.
Camera AI evidence
Capture photo → Foundry vision → observation
Mobile/browser capture stores the image against the selected site and latest daily report, sends it to Microsoft Foundry vision, then lets the user accept or edit the structured finding before it becomes an observation.
Evidence trail
1 images stored · latest status accepted
No image selected yet.
Foundry result will appear here with hazard type, severity, confidence, and recommendation. User acceptance is required before an observation is created.
Latest audit events
construction.demo.seedconstruction_tenant · 2CcZq-lv14YCwuYh7/2/2026, 5:03:19 PM
construction.tenant.bootstrapconstruction_tenant · 2CcZq-lv14YCwuYh7/2/2026, 5:03:19 PM
Open observations
safetyhighopen
Missing edge protection at Level 3 west slab
Level 3 · west slab · Safety officer
qualitymediumopen
Rebar cover check pending before pour
Zone B · grid C4 · QA/QC inspector